SpaceX RORO's Fabrication and Rental
Project details
Project Overview
The customer needed a solution for moving their equipment on and off a barge to their facility. They needed extended length to clear rock rip rap, high capacity with a generous SWL, and flexibility to handle elevation change due to tidal variation. Nordholm provided just what was needed on a design-build basis.
- 94 foot-long RoRo Bridges with Hinged End Ramps.
- Shipped to SpaceX Long Beach for moving boosters to and from the pier and barge.
- Load Tested
Video is missing
Our work